Sample pack
A redacted specimen of the deliverable buyers are actually purchasing.
This is a format specimen, not a live claim. It shows the line-item structure, citation treatment, photo-callout logic, and adjuster-letter tone a buyer can expect before starting payment.
What this page proves
Proof is visible before purchase: format, support style, and reviewer framing are all shown in the open.
Sample materials show format and workflow only; they do not guarantee the result any carrier will reach on a live claim.
Redacted specimen pack
See the proof format before you pay.
Line-item excerpt
RFG-STARTER
Starter course at eaves and rakes
214 LF
Measurement report perimeter math cross-checked against uploaded elevation set.
RFG-DRIP
Drip edge replacement
214 LF
Edge-metal exposure visible in photo callouts 01 and 03; municipality permit scope requires replacement when detached.
Citation treatment
- • Edition stamp: 2022 California Building Code adoption
- • Jurisdiction support: Pinole municipal adoption record on file
Photo + letter proof
Detached edge metal at rake return
Photo annotation points the adjuster to the exact failure location instead of leaving a bulk photo set to interpret.
Prepared for regional carrier review. The requested additions stay inside the submitted roof scope and tie back to the uploaded measurement set, photo callouts, and the edition-stamped jurisdiction support notes on file. The intent is not to broaden the loss, only to reconcile omitted edge, accessory, and disposal scope with documented conditions. This packet is designed to support review and does not guarantee a carrier outcome.
Line-item specimen
RFG-STARTER
Starter course at eaves and rakes
214 LF
Measurement report perimeter math cross-checked against uploaded elevation set.
RFG-DRIP
Drip edge replacement
214 LF
Edge-metal exposure visible in photo callouts 01 and 03; municipality permit scope requires replacement when detached.
RFG-RIDGE
Ridge / hip cap replacement
52 LF
Field measurements reconciled against carrier estimate omission and ridge footage in uploaded report.
RFG-HAUL
Haul-off and dump fees
1 EA
Single mobilization allowance tied to tear-off volume and local disposal lane.
Callout 01
Detached edge metal at rake return
Photo annotation points the adjuster to the exact failure location instead of leaving a bulk photo set to interpret.
Callout 02
Accessory count mismatch at ridge transition
Pack note ties the visual evidence to the quantity delta so the requested addition reads like documented scope, not opinion.
Citation treatment
- • Edition stamp: 2022 California Building Code adoption
- • Jurisdiction support: Pinole municipal adoption record on file
- • Pack note: local amendment path cleared before release
Adjuster letter excerpt
Prepared for regional carrier review. The requested additions stay inside the submitted roof scope and tie back to the uploaded measurement set, photo callouts, and the edition-stamped jurisdiction support notes on file. The intent is not to broaden the loss, only to reconcile omitted edge, accessory, and disposal scope with documented conditions. This packet is designed to support review and does not guarantee a carrier outcome.
Release path
How a paid pack moves from intake to delivery.
01
Jurisdiction screen
Coverage is checked by ZIP before payment. Accepted, limited, and unsupported paths are explicit.
02
Pack assembly
Line items, math, photo callouts, and an adjuster letter are compiled into one documented supplement pack prepared for carrier review.
03
Reviewer signoff
A human reviewer verifies edition stamping, attachment completeness, and revision boundaries before release.
Next step
If the specimen looks right, move into the validated intake path.
Start a draft, clear the ZIP gate, and open payment only after the file set is confirmed.